Page Tools
Project gallery
Sign up to receive ArcelorMittal Europe news alerts by email
Page tools
Print
Bookmark
Share on
Contact us Contact us

Vogue Square underground car park

ArcelorMittal Sheet Piling supplied 355 tonnes of sheet piles for the construction of a two-level underground car park for the new shopping mall and hotel Vogue Square, in Brazil.

An environmentally-friendly and safe place to live

Recreio dos Bandeirantes is a nice neighbourhood located about 35 km from Rio de Janeiro’s city centre. This youngest district of the city, with a population of around 100 000, continues attracting middle and upper-class families looking for an environmentally-friendly and safer place to live.

Being a relatively recent development, the architecture consists primarily of small buildings and residences close to the seafront, with up to three stories. However, like in most urban cities, parking area is a challenge for new residential buildings and shopping malls.

Sheet piles: a not so common solution in Brazil for underground car parks

The choice of the two-level underground car park for the new shopping mall and hotel Vogue Square was quite straightforward, and the design engineer proposed to the owner a still quite rare solution in Brazil: steel sheet piles used as the permanent retaining wall around the parking, but foremost, the sheet piles stay apparent. To enhance aesthetics, sheet piles are coated.

ArcelorMittal supplied 355 tonnes of 12.0 m long GU 14N sheet piles in steel grade S 430 GP. According to European standards (EN 1993- 5), retaining walls built with U-type sheet piles should be installed as double piles, and each double pile should transfer shear forces, so the double piles were delivered crimped (standard pattern). 

The project started in 2014, and the sheet piles were supplied and installed between August and September of 2014.

Fast, watertight and aesthetical

The key advantage of the steel sheet pile solution was definitely its fast execution. It took the contractor only 35 days to install the 230 double piles, with a daily average rate of 6 to 7 double piles.

Additional key advantages of the sheet pile solution were the high watertightness of the wall, the great, yet uncommon aesthetical aspect, the reduced number of workers required to execute the retaining wall, and the fact that being a prefabricated element, there is no need for curing time or inspection of the quality of in-situ poured material. Besides, such a work environment is quite clean for a construction site.

The mall and the hotel opened in 2016.